Kitchen Remodeling in Houston, TX
Houston kitchens sit on slabs that do not stay level. Long cabinet runs are laser-set, shimmed and scribed to the floor as found, and countertop support is verified before templating. Plumbing and electrical enter as subcontracted scope inside the remodel.
- Cabinet runs laser-set and scribed
- Countertop support verified before templating
- Finish work exempt from permits
Estimate your project
Professional Quotes for the Houston Area
What can we help you with?
Pick one or more. No contact details needed yet.
Used to price the job for your area.
Your quote is ready
Where should we send it?
$0
Quote Breakdown
Materials we use:
Reflects our $500 project minimum.
Ready to start? Call now to lock in this rate and schedule your project.
512-290-5153Quick Overview
Houston kitchen remodeling at a glance
- Small kitchen: $10,000 to $18,000 per kitchen
- Mid-range kitchen: $18,000 to $35,000 per kitchen
- Large or luxury: $30,000 to $50,000, luxury $50,000 to $80,000 and above
- Timeline: 1 to 4 weeks on site with 2 to 5 installers
- Permit position: Cabinets, counters, backsplash and flooring are exempt finish work
- Outside our scope: Standalone electrical or plumbing calls, appliance hookups beyond install support
Direct Answers
Kitchen remodeling in Houston: direct answers
Plan one to four weeks on site once cabinets arrive, with the cabinet lead time before that setting most of the overall schedule.
Cabinets, countertops, backsplash, flooring and trim are exempt finish work, while relocating or replacing plumbing and electrical fixtures pulls a permit under whichever trade performs it.
Qualified subcontractors, engaged only as part of the larger remodel we are managing, since we do not accept purely plumbing or purely electrical work.
Why Houston Is Different
What governs a Houston kitchen build
A kitchen is the least forgiving room in a Houston house because everything in it is long, straight and level by design, and the ground beneath it is none of those things. Cabinet runs, countertop seams and backsplash courses all read any error. The build sequence is written around that.
Level is measured on site
Smectitic Beaumont clay expands through a wet spring and contracts through an August drought, raising and dropping slab edges differentially within a single year. A twelve-foot cabinet run installed to the floor, with no laser line, will telegraph that deviation into every door reveal and countertop seam. We shoot a level line across the room first, set base cabinets to that line, shim to the slab as found, and scribe filler and toe kick to close the gap. Crown molding is then cut to the ceiling as it runs.
Countertop support and seam placement
Stone is unforgiving of deflection. Before any templating happens, we verify that base cabinets are mechanically fastened, plumb and coplanar, that spans across sink and cooktop cutouts are supported, and that any peninsula or island is anchored to the slab and not left standing on cabinet boxes alone. Seam locations are agreed in advance and kept off cutouts. Where the slab has tilted near one of the metro's 300-plus growth fault traces, support blocking carries the deflection so the stone does not. Templating against an unverified cabinet run is the most common cause of a cracked countertop here.
Excluded trades, and where they legitimately fit
Plumbing, electrical, roofing and foundation work sit outside our direct scope. A kitchen remodel, however, is precisely the larger-remodel case in which plumbing and electrical are subcontracted and run under our schedule: sink and dishwasher connections, a relocated gas line, added circuits for an island. That is coordinated work inside a project we are managing. A request for electrical work alone, or a leak diagnosis alone, falls outside what we accept. Relocating a sink across a slab-on-grade kitchen also means a concrete penetration, priced separately before demolition.
Houston: 77002 · 77006 · 77007 · 77008 · 77036 · 77084
Typical kitchen remodeling scopes in Houston
Small Houston kitchens run $10,000 to $18,000 per kitchen, mid-range $18,000 to $35,000, large $30,000 to $50,000, luxury $50,000 to $80,000 and above. Cabinet linear footage, countertop material and whether the sink moves set the position within the band.
Galley Refit, Cabinets and Backsplash
Existing footprint, no slab penetration
Original cabinet layout retained and replaced box for box, with crown molding, hardware and a full-height backsplash. Base run scribed to a slab with roughly half an inch of fall across twelve feet.
| Rooms | Kitchen |
| Duration | 8 - 12 days |
| Lead time | 3 - 4 weeks |
| Products | Daltile backsplash tile, MAPEI thin-set and polymer grout, Schluter metal edge protection, Sherwin-Williams Emerald trim enamel |
Mid-Range Remodel With Island
Island anchored to slab, circuits subcontracted
Wall cabinets raised to the ceiling with new crown, perimeter and island cabinetry set to a single laser line, and flooring tied into the adjoining living room. Island circuits run by our electrical subcontractor inside the schedule.
| Rooms | Kitchen, breakfast area |
| Duration | 2 - 3 weeks |
| Lead time | 4 - 5 weeks |
| Products | Cabinet boxes and crown molding, Schluter-DITRA under tile flooring, MAPEI thin-set, Mohawk luxury vinyl plank at the tie-in |
Large Remodel, Sink Relocated
One slab penetration scoped before demolition
Wall between kitchen and dining removed to the extent framing allowed, cabinetry reconfigured, and the sink moved to the new peninsula. The single concrete penetration was priced, trenched and patched by our plumbing subcontractor before finish work began.
| Rooms | Kitchen, dining, pantry |
| Duration | 3 - 4 weeks |
| Lead time | 5 - 6 weeks |
| Products | Cabinet boxes, USG Sheetrock at the opened wall, Daltile backsplash, MAPEI grout, Sherwin-Williams Duration |
Site Conditions
Conditions we verify before cabinets go up
Each of these is measured and recorded at the walkthrough, because each one changes the install method; the material list stays the same.
| Condition | Where you see it in Houston | What it needs |
|---|---|---|
| Slab-on-grade, out of level | Most Houston kitchens built after 1950 | Laser line established, base cabinets shimmed, toe kick and filler scribed |
| Pier-and-beam floor system | Pre-WWII bungalows in the Heights and Montrose | Deflection checked and stiffened before cabinet or stone loading |
| Tilt near a growth fault trace | Any of 300-plus traces across the metro | Support blocking carries the deviation, countertop seams moved off cutouts |
| Out-of-plane walls and ceilings | 1950s and 1960s ranch stock in Oak Forest, Westbury | Furring or plane correction before cabinet hanging and crown molding |
| Galvanized or aging supply lines | Inner Loop homes built before 1960 | Identified at demolition; replacement priced by our sub |
| Humidity above 75 percent | Metro-wide, most of the year | Cabinet boxes acclimated on site and adhesives selected for the conditions |
Materials
Kitchen remodeling in Houston: materials we specify
Cabinets are only as true as the line they are set to, so the list starts with layout. A Bosch laser level sets the reference, ProLift or Bora cabinet jacks hold the boxes, and DeWalt impact drivers fasten them. Boxes run from prefab through Fabuwood or Schrock semi-custom, finished with MDF or wood crown and Amerock or Liberty pulls, with MSI or Caesarstone quartz where countertops are in scope.
| Product | Brand | Why it earns the spot |
|---|---|---|
| Bosch laser level | Bosch | Critical for upper cabinet alignment. |
| Cabinet jack | ProLift / Bora | Helps lift and hold cabinet boxes. |
| DeWalt impact driver | DeWalt | Common install driver for framing and cabinetry. |
| Prefab kitchen cabinets | IKEA / Home Depot / Lowe's | Entry to mid-market cabinet option. |
| Cabinet crown molding | MDF / wood crown | Provides finished top profile. |
| Cabinet pulls and knobs | Amerock / Liberty | Finish hardware for cabinet doors and drawers. |
| Quartz countertop slab | MSI / Caesarstone | Countertop install coordinate only; fabrication may be separate. |
| Semi-custom cabinets | Fabuwood / Schrock | Higher flexibility than prefab. |
Material grades follow the walkthrough. The scope includes material cost.
Pricing
Houston kitchen pricing
Bands reflect current Houston metro project pricing. Project minimum is $500, applied to multi-item project work.
Small, mid-range and large kitchen bands are priced in detail in the Houston kitchen remodel cost guide.
| Scope | Typical Houston range | What drives the spread |
|---|---|---|
| Small kitchen | $10,000 - $18,000 per kitchen | Cabinet linear footage, laminate or entry-level stone, existing layout kept |
| Mid-range kitchen | $18,000 - $35,000 per kitchen | Ceiling-height uppers, crown molding, island cabinetry, flooring tie-in |
| Large kitchen | $30,000 - $50,000 per kitchen | Wall opened, layout reconfigured, pantry and dining brought into scope |
| Luxury kitchen | $50,000 - $80,000 and above | Custom cabinetry, stone selection, full finish package across adjoining rooms |
| Backsplash tile, installed | $12 - $22 / sq ft | Pattern, cut count, edge treatment and outlet cuts through the field |
Minimum project size is $500. We confirm every figure on site.
Process
How a kitchen build is sequenced
- 1 Measure, then verify level and plane. Cabinet runs, wall plane and slab fall are recorded at the walkthrough. Those three readings determine install method and appear on the estimate.
- 2 Scope fixed in writing before ordering. Cabinet schedule, countertop material, backsplash layout, flooring tie-ins and any subcontracted trade are documented. Nothing is ordered against an assumption.
- 3 Demolition and plane correction. Old cabinetry and finishes removed, substrate cleaned, and out-of-plane walls furred or corrected.
- 4 Subcontracted trades inside the remodel. Plumbing and electrical rough work is scheduled here, as part of this project, under our calendar. Each trade pulls its own permit where the work triggers one.
- 5 Cabinets set to a laser line. Base cabinets are leveled to the line, mechanically fastened, shimmed to the slab and scribed. Uppers follow, then crown molding cut to the ceiling as it runs.
- 6 Template, backsplash, trim, walkthrough. Countertops are templated only after cabinet verification, backsplash follows the stone, then trim and paint. Final walk is done under the kitchen lighting you will use.
Coverage
Houston kitchens we build
The service footprint spans the Inner Loop and the established subdivisions outside 610. Housing vintage changes the scope of work far more than distance does.
Our Services
Trades related to kitchen remodeling in Houston
Kitchen work overlaps four other trades on nearly every project. Running them in-house keeps the sequence and the responsibility in one place.
Tile installation in Houston
Backsplash and tiled kitchen floors come off the same specification as the remodel. Porcelain installs at $12 to $22 per square foot in Houston.
Flooring installation in Houston
Kitchens rarely stop at the doorway. Luxury vinyl plank runs $4 to $8 per square foot installed and hardwood $5 to $12, with color-matched transitions at the tie-in.
Drywall installation in Houston
Opening a wall between kitchen and dining means new gypsum. We replace the affected wall plane in full and texture it to match.
Painting services in Houston
Trim, crown and wall color finish the room after stone and backsplash are in. Interior work runs $1.50 to $3 per square foot of floor area.
Fence installation in Houston
Outside the house, the same clay moves fence posts. New runs and full replacements only, at $30 to $50 per linear foot installed.
Common Questions
Kitchen remodeling questions
How long will my kitchen be unusable?
One to four weeks on site for a Houston kitchen. A galley refit on the existing footprint finishes in eight to twelve days; a large reconfiguration with a relocated sink takes three to four weeks.
Do cabinets and countertops require a Houston permit?
No. Cabinets, countertops, backsplash, flooring, trim and paint are exempt finish work. The trigger is the work itself, and fixture changes are what pull permits.
Can you add outlets and move my sink?
Yes, through subcontractors engaged as part of a Houston remodel. A relocated sink in a slab-on-grade kitchen also means a concrete penetration, priced before demolition.
Will you take an electrical-only job?
No. In Houston, electrical and plumbing are subcontracted only inside a larger remodel we are managing. A standalone electrical request, or a leak diagnosis, falls outside the work we accept.
Why do my cabinet doors sit unevenly now?
Usually because the original run was set to the floor, with no level line. Houston’s Beaumont clay moves slab edges seasonally, and that deviation shows up in door reveals first.
Can I keep my existing layout to save money?
Yes, and on a Houston slab it is normally the largest saving available. Holding sink and appliance positions keeps slab penetrations out of the budget and shortens the schedule by about a week.
What is your minimum for kitchen work?
Our Houston project minimum is $500 for multi-item work. Small kitchen scopes start around $10,000, so the minimum rarely governs a remodel.
Do you install appliances as part of the remodel?
We provide install support on Houston remodels, setting cabinetry and openings to the appliance specifications. Hookups beyond that sit with the subcontracted trade inside the same project schedule.
Kitchen remodeling in Houston: how we work
Houston kitchen remodeling jobs follow four working rules: three readings before a price; cabinets set to a line; templating only after verification; one schedule, all trades.
Three readings before a price
Slab fall, wall plane and ceiling run are all measured at the walkthrough. Those numbers set the install method and are written into the estimate.
Cabinets set to a laser line
Every base run is set to a laser line and shimmed to the slab as found. Scribed filler and toe kick absorb the deviation, so the doors hang true.
Templating only after verification
Countertops are templated once cabinets are proven plumb, fastened and coplanar. That single rule prevents most cracked stone in this market.
One schedule, all trades
Subcontracted plumbing and electrical are booked against our calendar inside the remodel, so sequencing and accountability stay with one team.
Start with the measure
Before anyone quotes cabinetry, we read the slab, the walls and the ceiling line. Reach us at 512-290-5153 and we will schedule the walkthrough around your Urban Harvest Saturday on Richmond.
Our Houston Homeowner Resources
Drywall Installation · Fence Installation · Flooring Installation · Painting Services · Tile Installation