Bathroom Remodeling in Austin, TX

Tarrytown bathrooms and Mueller townhomes do not share the same approach — a 1950s tile surround demo is a different scope than a new-build shower layout. We walk the space first, plan the trade sequence second, and do not start demo until waterproofing is staged and every material is confirmed on-site.

  • Schluter KERDI waterproofing on every shower
  • Sequence: demo, board, tile, fixtures
  • No plumbing rough-ins — finish work only

Get Instant Quote

Professional Quotes for Central Texas

Austin — 78703 · 78723 · 78704

Bathroom Remodeling Projects in Austin

Bathroom remodels in Austin run $6,500–$28,000 depending on scope — a standard tub-to-shower conversion in a Mueller townhome prices differently than a full primary bath gut in Tarrytown. Demo, backer board, Schluter waterproofing, tile, vanity, and fixture installation are all included. Plumbing rough-ins and electrical are outside this scope.

Primary Bath Gut & Retile

Full primary bath gut and retile, Tarrytown estate

A 1960s ranch near the Pennybacker Bridge — the original primary bath had a cracked shower pan and 40-year-old ceramic tile throughout. We demoed to studs, installed James Hardie HardieBacker on all wet surfaces, applied Schluter KERDI waterproofing, set Daltile porcelain on walls and floors, and installed a Kohler vanity and toilet.

$14,200Tarrytown · 78703
RoomsPrimary bathroom
ScopeFull gut — 148 SF total
Duration8–10 days
DateJanuary 2026
ProductsJames Hardie HardieBacker cement board, Construction caulk and grout sealant (DAP / MAPEI), Kohler toilet, Vanity cabinet and top (Fabuwood / Kohler), Porcelain wall and floor tile (MSI / Daltile), Schluter shower system kit, Milwaukee reciprocating saw, Bosch rotary laser level

Tub-to-Shower Conversion

Curbless walk-in shower build, Mueller townhome

A Mueller townhome near the Project Connect light rail corridor — owners replaced a standard tub with a curbless walk-in shower. We demoed the tub surround, installed HardieBacker and Schluter KERDI waterproofing, set MSI porcelain tile on shower floor and walls in a stacked pattern, and roughed in a frameless recessed niche and new fixtures.

$8,400Mueller · 78723
RoomsHall bathroom
ScopeTub-to-shower conversion — 72 SF
Duration5–6 days
DateMarch 2026
ProductsJames Hardie HardieBacker cement board, Construction caulk and grout sealant (DAP / MAPEI), Kohler toilet, Vanity cabinet and top (Fabuwood / Kohler), Porcelain wall and floor tile (MSI / Daltile), Schluter shower system kit, Milwaukee reciprocating saw, Bosch rotary laser level

Guest Bath & Powder Room Refresh

Dual-bath retile and vanity upgrade, Bouldin Creek

A Bouldin Creek bungalow near Barton Springs Pool — guest bath and powder room both needed tile replacement and updated fixtures. We replaced floor tile in both rooms, retiled the shower surround with MSI subway field tile, swapped Kohler vanity tops and toilets, and updated all trim to match the refreshed interiors.

$9,800Bouldin Creek · 78704
RoomsGuest bath + powder room
Scope2 rooms — 95 SF combined
Duration6–7 days
DateApril 2026
ProductsJames Hardie HardieBacker cement board, Construction caulk and grout sealant (DAP / MAPEI), Kohler toilet, Vanity cabinet and top (Fabuwood / Kohler), Porcelain wall and floor tile (MSI / Daltile), Schluter shower system kit, Milwaukee reciprocating saw, Bosch rotary laser level

Our Services

Related Installation Services in Austin

Bathroom remodels connect to tile, drywall, painting, cabinetry, and flooring trades. These are the services most often scoped alongside a bathroom renovation at Austin addresses.

Tile Installation

Travis County soils shift enough to crack standard tile bonds over time. We lay Schluter-DITRA uncoupling membrane under every bathroom floor tile installation and Schluter-KERDI behind every shower wall — so grout stays tight through Austin’s seasonal ground movement.

View Tile

Drywall Installation

Bathroom demo in Tarrytown and Bouldin Creek homes regularly reveals water-damaged drywall at the rough opening perimeter. We hang USG 5/8" moisture-resistant board, tape with FibaTape, and coat with USG All Purpose joint compound before any backer board or tile goes up.

View Drywall

Painting Services

After tile grout cures and fixtures are set, bathroom walls get Sherwin-Williams Emerald in semi-gloss — the right sheen for humidity-heavy spaces like Mueller townhome baths and Tarrytown primary suites. We coordinate paint scheduling with the tile cure window.

View Painting

Cabinet Installation

Vanity cabinet upgrades are part of the bathroom scope on most Tarrytown and Bouldin Creek renovations. When owners want semi-custom Fabuwood or Schrock boxes, we sequence the cabinet set so plumbing rough-ins and tile work align on the correct dates.

View Cabinets

Flooring Installation

Bathroom tile transitions to hallway flooring at the threshold. We set Roberts underlayment and install Lifeproof LVP in the adjacent hall, then add a Zamma color-matched reducer strip so the bathroom and hallway floor elevations meet cleanly.

View Flooring

Common Questions

FAQs About Austin Bathroom Remodeling

Do you handle plumbing or electrical in Austin bathrooms?
No. Our bathroom scope covers demo, HardieBacker, Schluter waterproofing, tile, vanity installation, toilet set, and finish trim. Plumbing rough-ins and electrical panel work are coordinated separately. We schedule around your licensed plumber and electrician so the trade sequence stays intact.
Schluter-KERDI membrane behind shower walls and Schluter-DITRA on shower floors, both bonded with MAPEI thin-set. Standard drywall behind a tile shower is not an acceptable substrate in Austin’s humidity. This is the system we use on every Tarrytown, Mueller, and Bouldin Creek job.
A primary bath gut and full retile typically runs 8–10 days. A tub-to-shower conversion in a Mueller townhome runs 5–6 days. Scope complexity — niche count, ceiling height, fixture type — moves the timeline more than square footage does.
Yes. We often run a primary bath and guest bath simultaneously in Tarrytown and Westlake homes where staging space allows. Scheduling both rooms in one mobilization reduces total downtime and keeps the trade sequence clean across both spaces.
Demo, HardieBacker installation, Schluter waterproofing, tile on walls and floors, vanity cabinet and top, toilet set, trim, and finish work. Not included: plumbing rough-ins, electrical, glass enclosure fabrication, and appliance hookups beyond basic positioning support.

Why Homeowners Choose HandyMan Install

Written Scope — Every Job
Every project gets a written scope confirming service, materials, labor rate, and timeline before work starts. Signed before mobilization.
Trade Sequencing — No Rework
We understand construction order. Drywall before paint. Flooring before baseboard. Cabinets before countertop template. Every trade goes in sequence.
$500 Minimum — No Patch Calls
We focus on full installation scopes, not single-item repairs. This keeps our scheduling consistent and quality high on every project we take.

Call 512-290-5153

The Bathroom Scope Is Simpler to Start Than You Think

Call 512-290-5153 and let us walk the space. Tarrytown to Mueller, we sequence the trades, stage the materials, and hand it back clean — so your Saturday morning is back at Zilker Park instead of navigating a construction schedule on your own.

Austin Homeowner Resources

Tile Installation  ·  Drywall Installation  ·  Painting Services