Cabinet Installation in Austin, TX

Cabinets go in fast when the layout is locked, the walls are plumb, and the right jack is on the truck. Crestview kitchen renovations and Clarksville bath upgrades both move on the day we show up — shimmed to level, crown-tied to the ceiling, and hardware-set before the week is out.

  • Shimmed and level — set same day
  • Crown molding tied in same visit
  • Prefab through semi-custom: one crew

Get Instant Quote

Professional Quotes for Central Texas

Austin — 78752 · 78703 · 78704

Cabinet Installation Projects in Austin

Cabinet installations in Austin run $1,800–$12,500 depending on box count, cabinet line, and crown tie-in scope. A 10-cabinet Crestview kitchen layout prices differently than a full Clarksville primary bath with floating vanities and ceiling crown molding. Scope is set at the address — room dimensions and ceiling height determine the final number.

Kitchen Cabinet Installation

14-cabinet kitchen set with crown, Crestview ranch

A 1958 ranch near Anderson High — owners had sourced Fabuwood semi-custom Shaker boxes and needed them set in one week before countertop template. We installed 14 upper and lower cabinets, shimmed across a ⅜" floor slope using GRK screws and shim stacks, ran MDF crown to the ceiling line, and set all Amerock bar pulls.

$6,800Crestview · 78752
RoomsKitchen
Scope14 cabinets + crown molding
Duration2–3 days
DateJanuary 2026
ProductsPrefab cabinets (IKEA / Home Depot / Lowe's), Semi-custom cabinets (Fabuwood / Schrock), Cabinet screws and shims (GRK), Cabinet pulls and hinges (Amerock / Blum), Cabinet crown molding (MDF / wood crown), Bosch laser level, Kreg clamp set, Cabinet jack (Bora / ProLift)

Primary Bath Vanity Installation

Floating double vanity and linen tower, Clarksville

A renovated Craftsman near West 6th — owners wanted a 72" floating double vanity and a 90" linen tower set in the primary bath before tile work started. We built the custom mounting framework, set Fabuwood boxes on a ProLift cabinet jack, ran Blum soft-close hinges on every door, and confirmed level to the tile floor in one visit.

$3,200Clarksville · 78703
RoomsPrimary bathroom
Scope2 vanity units + linen tower — 8 cabinets
Duration1–2 days
DateFebruary 2026
ProductsPrefab cabinets (IKEA / Home Depot / Lowe's), Semi-custom cabinets (Fabuwood / Schrock), Cabinet screws and shims (GRK), Cabinet pulls and hinges (Amerock / Blum), Cabinet crown molding (MDF / wood crown), Bosch laser level, Kreg clamp set, Cabinet jack (Bora / ProLift)

Kitchen + Butler's Pantry Cabinet Set

22-cabinet kitchen and pantry package, Travis Heights

A remodeled home near the Travis Heights park trails — 22 Fabuwood semi-custom cabinets spanning kitchen and butler’s pantry. Phased across two days, shimmed across a ¼" slope using GRK shim stacks, crown run throughout both spaces, and countertop template staged for day three. The Bosch laser level confirmed level across the full run before any screw went in.

$11,400Travis Heights · 78704
RoomsKitchen + butler's pantry
Scope22 cabinets + crown tie-in
Duration3 days
DateMarch 2026
ProductsPrefab cabinets (IKEA / Home Depot / Lowe's), Semi-custom cabinets (Fabuwood / Schrock), Cabinet screws and shims (GRK), Cabinet pulls and hinges (Amerock / Blum), Cabinet crown molding (MDF / wood crown), Bosch laser level, Kreg clamp set, Cabinet jack (Bora / ProLift)

Our Services

Related Installation Services in Austin

Cabinet installation anchors kitchen and bath renovation projects. These are the services most often sequenced alongside a cabinet set at Austin addresses from Crestview to Travis Heights.

Kitchen Remodeling

Cabinet installation is the structural core of every kitchen remodel. Once Fabuwood or prefab boxes are shimmed and leveled with a Bosch laser, the backsplash tile, crown molding, countertop template, and hardware all sequence off that confirmed install date.

View Kitchen

Bathroom Remodeling

Vanity cabinet installation sequencing in Mueller and Tarrytown renovations requires backer board and tile to be complete before the vanity is set. We coordinate the trade order so nothing is reinstalled — cabinets go in on dry, finished substrate every time.

View Bathroom

Painting Services

Cabinets often receive a factory-grade spray finish after installation. Sherwin-Williams Emerald in satin or semi-gloss over Insl-X Stix primer gives a durable, cleanable surface. We coordinate the paint window with the cabinet set date so the scope stays on one timeline.

View Painting

Trim & Baseboard Installation

Crown molding tie-ins at the ceiling line are part of the cabinet scope on Anderson High-area ranches and Clarksville Craftsman renovations. MDF crown is coped at every inside corner — no mitered joints that will open when Crestview’s clay substrate shifts.

View Trim

Flooring Installation

Base cabinets install after flooring is complete. Once Lifeproof LVP or engineered hardwood is set, we shim cabinets to the finished floor height and run the toekick so the base covers cleanly. The correct sequence prevents any cabinet from sitting proud of the finished floor.

View Flooring

Common Questions

FAQs About Austin Cabinet Installation

How long does kitchen cabinet installation take in Austin?
A standard 12–16 cabinet kitchen set runs 2–3 days. A full Crestview kitchen plus a butler’s pantry can run 3–4 days depending on ceiling height and crown complexity. Scope is confirmed at the address before the install date is locked in.
Yes. We install IKEA SEKTION, Fabuwood, Schrock, and locally sourced prefab boxes. Hardware, shimming, crown molding, and scribe-molding are handled the same regardless of box brand. A Bosch laser level and ProLift cabinet jack are on every job.
Base cabinets go in after flooring — or on the subfloor if finish flooring has not been installed yet. We shim to level across whatever slope exists. A ⅜" drop across a 10-foot run is typical in older Crestview and Allandale homes and is corrected with GRK shim stacks.
Yes. We run MDF or wood crown from existing cabinet tops to the ceiling line, cope every inside corner, and caulk before paint. This is a common add-on in Anderson High-area ranches where the original cabinet install skipped the crown step entirely.
No. Countertop fabrication and templating are separate trades. We stage the cabinet set to be complete 24–48 hours before your fabricator templates — so box heights, fillers, and overhangs are fully settled before the slab is cut.

Why Homeowners Choose HandyMan Install

Written Scope — Every Job
Every project gets a written scope confirming service, materials, labor rate, and timeline before work starts. Signed before mobilization.
Trade Sequencing — No Rework
We understand construction order. Drywall before paint. Flooring before baseboard. Cabinets before countertop template. Every trade goes in sequence.
$500 Minimum — No Patch Calls
We focus on full installation scopes, not single-item repairs. This keeps our scheduling consistent and quality high on every project we take.

Call 512-290-5153

Cabinets Set. Crown Tied. Done Before the Week Ends.

Call 512-290-5153 and we’ll confirm scope at the address. From Crestview to Travis Heights, one efficient mobilization gets the boxes in, shimmed, and crown-tied — so the countertop template happens on schedule and nothing is waiting on a second crew.

Austin Homeowner Resources

Kitchen Remodeling  ·  Bathroom Remodeling  ·  Painting Services